From Complexity to Clarity.
We untangle complex business processes and turn them into clear decisions and concrete actions.
Here you see it on a production line changeover: an AI agent builds scenarios for the planned change and tests each one on a copy of the line before anything changes on the real one.
Your line and your goal at a glance.
You see every station with its cycle time, buffer, availability, staffing and cost, and next to it the goal set by management: output, budget and deadline.
Demo line: 6 stations for steel brackets. Welding takes longest, at 45 seconds per part.
First the verified baseline, then the investment.
You see the bottleneck, stations that wait or are blocked, and capacity left unused. What costs nothing comes first.
- utilisation at Weld, the bottleneck
- 100%
- of the shift Form is blocked
- 21%
- of the shift Pack waits for parts
- 31%
You describe the change. The agent builds the scenarios.
You write in plain language what you plan. The agent turns it into scenarios S1 to S3, and the simulation computes their numbers.
Each scenario runs on its own copy of the line.
Your line keeps producing meanwhile. On the demo line, the request becomes three scenarios:
- S1Larger buffer before packing
- S2Faster feed
- S3Weld cycle 32 instead of 45 s
Tested against fail states, with injected faults.
In S3, welding fails for 15 minutes and parts pile up before it. The real line runs on untouched.
- Jam
- Deadlock
- Takt above target
- Full buffer
With the outage S3 still makes 86.5 parts/h, the line today 76.9 parts/h.
The scenarios side by side, with the evidence.
For each scenario you see output, lead time, staffing, cost and investment with the evidence, plus a report for approval.
| Scenario | Output | Lead time |
|---|---|---|
| Line today | 79.7 parts/h | 10.6 min |
| S1Larger buffer | 79.7 parts/h | 10.6 min |
| S2Faster feed | 80.0 parts/h | 12.6 min |
| S3Weld cycle 32 s | 88.2 parts/h | 4.6 min |
Demo line, 8-hour shift, mean of 20 runs
S3 wins, because welding is the bottleneck.